Powered Land SiteLand is available almost everywhere.
A substation with spare capacity and a utility that will commit to a date is not.
Find AI and HPC land with power available today
Buy or lease — greenfield, shells and mining conversions, with the power status on every one.

Active listings
Availability, pricing and terms move quickly. The most competitive sites close before they appear here.
Live inventory from the QuoteColo marketplace. Details are provided by sellers; ask about a site and we check its current power status and terms.
AI & HPC Powered Sites — Active Listings (US & Canada)
AI infrastructure, mining sites and equipment — all in one place.
Listings are updated regularly. Availability, pricing, and terms change quickly — the most competitive sites often move off-market before they appear here. Use the form below for current status and inventory not listed publicly.
Powered Land Site
Powered Land SiteHouston, TX 45MW Greenfield - 45MW Grid & 50MW NG
Houston, TX
- 45 MW
- 7¢/kWh
- 40 acres
- Powered Land
Powered Land Site
Powered Land Site
Powered Land SiteMooresboro, NC 3MW Edge Container Farm
Mooresboro, NC
- 3 MW
- 6¢/kWh
- 12 acres
- Existing Data Center
Powered Land SiteHouston, Texas 5MW Existing Mining Facility
Houston, TX
- 5 MW
- 6.5¢/kWh
- 1 acre
- Existing Data Center
Powered Land SiteHouston, Texas 3MW Existing Mining Facility
Houston, TX
- 3 MW
- 6.5¢/kWh
- 1 acre
- Existing Data Center
Powered Land SiteAlberta, Canada 10MW Natural Gas sites for AI (6 months RFS)
- 10 MW
- 7.5¢/kWh
- 1 acre
- Existing Data Center
Can’t find what you need?
We have access to additional off-market inventory not listed here. Contact us with your requirements.
For Buyers
Browse listings and submit an inquiry directly to the seller. No account required. QuoteColo helps connect you with the right opportunities.
Have infrastructure to sell or lease?
List your AI sites, mining farms, ASIC miners, containers or equipment on QuoteColo Marketplace. Create a seller account and reach qualified buyers.
List Your InventoryHow it works
Tell us the load and the date
MW target, region, and when you need power live. If you don't know whether you're leasing, buying or building, that's a normal starting point. It's the thing we work out first.
We screen for power, not listings
Anyone can send you a list of sites. We check whether the load is live today or contingent on a Letter of Authorization, whether there's an executed interconnection agreement or just a letter, and whether the substation has actual spare capacity.
You see verified against claimed
Per site: power status, entitlement stage, fiber and water, and all-in $/kWh with transmission and demand charges included — not the headline rate.
Introductions and diligence access
Direct contact with sellers and developers, plus data-room access where available, so you can underwrite before committing capital.
What makes land data-center-ready
Not all acreage near a substation qualifies. These criteria are the difference between a site that closes in 90 days and one that stalls for 18 months.
Power
Substation with available capacity, an interconnection agreement, and redundant A+B feeds.
Substation already at capacity, or an interconnection queue running 24+ months.
Zoning and entitlements
Pre-entitled land — industrial, tech or data-center use.
Agricultural or residential zoning requiring full rezoning — 6–24 months plus community approval risk.
Fiber and connectivity
On or adjacent to an existing long-haul route or dark fiber.
Nearest route requires a new build of 5+ miles.
Water and cooling
Municipal water access with adequate pressure and secured rights.
Arid region, no water rights secured, and no alternative cooling plan.
Climate and disaster risk
Seismic zone 0–1 and FEMA Zone X. Cooler ambient temperatures also cut PUE.
Seismic zone 3–4, or FEMA Zone A / AE — the 100-year flood plain.
Topography and access
Flat land with highway access. 40+ acres for a meaningful facility, 200+ for hyperscale.
Under 10 acres — limits build-out and expansion.
What an MW listing actually tells you
Seven common listing claims. Seven questions to ask before a site makes your shortlist.
Price per kWh
What the listing shows
$0.06/kWh
Looks cheap.
What to verify
Is it actually all-in?
Generation-only pricing can be 20–40% lower than the real cost.
Load available
What the listing shows
20 MW available
Sounds ready.
What to verify
Available today?
Or dependent on an interconnection agreement that could take months?
Substation distance
What the listing shows
0.5 miles
Sounds close.
What to verify
Does it have capacity?
Distance means little if the utility queue is full.
Physical structure
What the listing shows
Existing shell
Sounds turnkey.
What to verify
What can actually be reused?
Power infrastructure matters more than four walls.
Land / building price
What the listing shows
$4.2M
Sounds inexpensive.
What to verify
What's the all-in cost?
Interconnection and fiber can change the economics completely.
Cooling capacity
What the listing shows
1 MW cooling
Sounds sufficient.
What to verify
1 MW for what load?
Verify cooling kW per MW and liquid infrastructure.
AI-ready
What the listing shows
AI-ready
Sounds future-proof.
What to verify
But ready for what?
DLC-ready ≠ DLC-installed.
Ask what cooling, manifolds and supporting infrastructure actually exist today.
The 2026 land market
Powered land, with a utility LOA in place, carries a meaningful premium over unentitled acreage in every market. That premium is the interconnection work already done.
Premium markets
$1M – $4M+ / acreYou pay for adjacency — existing fiber density, established peering, enterprise proximity. Power is the constraint, and it's why the price is what it is.
| Market | Price / acre | Trend | Note |
|---|---|---|---|
| Northern Virginia | $2M – $4M+ | ↑↑ | Amazon paid ~$3.7M/acre for 189 acres, Nov 2025. Power moratorium caps new supply. |
| Silicon Valley | $1M – $3M+ | ↑ | Highest US cost outside NoVA. Land scarcity and permitting compress supply. |
Growth markets
$100K – $500K / acreAppreciating fastest, because this is where the primary markets' overflow is going. Still buyable, but the window is the thing that's closing.
| Market | Price / acre | Trend | Note |
|---|---|---|---|
| Phoenix | $200K – $500K | ↑↑ 40–50% | Fastest-appreciating secondary market. Water offset by solar. |
| Columbus / Ohio | $150K – $300K | ↑↑ 3–5× | Farmland at $10–15K/acre now exceeds $150K once rezoned. |
| Salt Lake City | $100K – $300K | ↑ 20–40% | Competitive power cost, good climate for air cooling. |
| Reno | $100K – $250K | ↑ 20–40% | California relief valve. Low taxes, cool climate. |
Power-rich markets
$5K – $200K / acreMost of our listings are hereLand stops being the constraint. What you're buying is grid capacity and a utility that will commit to a date — and at these prices the interconnection work, not the acreage, is the whole cost.
| Market | Price / acre | Trend | Note |
|---|---|---|---|
| Atlanta | $50K – $200K | ↑ | As low as $50K in outer metros; inner suburbs appreciating fast. |
| Dallas / DFW | $50K – $150K | ↑ | Most accessible large-market pricing. Rising near substations. |
| Wyoming / Idaho / rural West | $5K – $50K | → | Lowest US cost for power-rich greenfield. Power and fiber, not land price, is the limit. |
The spread between the two ends is roughly 800×. What closes most of that gap isn't the land — it's whether the interconnection work has already been done.
“Nobody publishes what a powered site actually costs, because at this scale every deal is negotiated. That’s not a problem you solve by searching harder. It’s a problem you solve by knowing who’s holding capacity this quarter and what they’ve been accepting. Send me the requirement and I’ll tell you where the numbers actually land.”
Bob Spiegel, Founder, QuoteColo

List your land. Reach the right buyers.
We connect landowners and data center developers to bring viable projects to life.
Reach 400+ pre-vetted buyers
We connect your site with our global network of active data center and HPC developers.
Qualified inquiries only
We pre-screen every buyer for real capital, timeline, and technical requirements.
NDAs and confidentiality protected
Your site details are shared only under NDA with serious, qualified developers.
No fees from you
Our service is free for sellers.
Faster path to offers
We save you months of outreach by bringing buyers directly to you.
Support from listing to LOI
From listing to LOI and beyond — we're with you through the entire process.
List it yourself on the QuoteColo platform
We built an AI & HPC land marketplace designed for landowners. Create your account, list your site, and connect with serious developers — on your terms.

Pre-vetted buyers
Developer network
and confidential
Frequently asked questions
Before you send the form
Does working with QuoteColo cost more than going directly to a landowner or operator?
No. QuoteColo states that your price is the same as going direct. Landowners and operators fund the introduction from their existing sales budgets, with no added cost to you.
Do I have to disclose who we are to get a shortlist?
You can start with your technical requirements. Some sellers require full qualification before discussing a site; others review the load, timeline and region first. We help identify which approach applies.
What do I get back?
You receive site options matched to your MW target, region and power-on date, with power status, pricing details and direct introductions. A real person follows up to clarify the fit and next steps.
What's the minimum MW target for this page?
Listings on the marketplace run from 0.4 MW to 200 MW, and half of them are 2.5–10 MW. For smaller deployments, GPU or single-rack colocation may fit better. At 1–5 MW, consider a wholesale suite as well as land.
About the sites
How current are the listings?
Availability and terms change quickly. We recheck the public listings and off-market inventory when you send your requirements.
What's the difference between a greenfield site and a mining-conversion shell?
Greenfield requires a new build. A mining conversion can include an existing building, live power and reusable electrical equipment, reducing the work needed before deployment.
How is data center land priced differently from other commercial real estate?
Usable power, utility commitments and interconnection work drive value. Acreage and location alone do not show what a site can support or what it will cost to develop.