Compare euro quotes with US rack prices
Wholesale Frankfurt quotes usually bill electricity on top, so a per-kW rate and a US all-in rack price don’t compare until power is added.
Frankfurt colocation is about EU data residency, DE-CIX interconnection, and power that is hard to get.
Send us your specs and we’ll email matched Frankfurt options with this month’s prices and terms, plus Amsterdam, London or Paris when they fit better.
Free for you: providers pay us. Questions first? Call (888) 400-5732.


“Frankfurt is one of the priciest markets in Europe. If your workload can sit in Amsterdam or Paris, I’ll price both before you sign.”
— Bob Spiegel, Founder, QuoteColo
Clients helped since 2004
Providers, including Frankfurt-area operators
For buyers: providers pay us
Prices and terms in writing, no sales calls
Wholesale colocation in Frankfurt benchmarks at about $250 per kW a month, the highest in Europe, because so little space is free: CBRE put wholesale vacancy at 4.6% in Q2 2026. Single racks and small deployments price higher per kW.
Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.
These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.
Match the facility to the exact hardware and usable power you need, then compare it with the European capacity already listed on our desk.
| Deployment | Usable power | What we check | Price USD / month |
|---|---|---|---|
| High-density rack | 15–20 kW per rack, enough for one B300-class server | Cooling and A/B power at your density | On request: call to confirm |
| Liquid-cooled or 20 kW+ per server | Your total kW and kW per rack | Installed liquid cooling, not “liquid-ready” | Case by case, higher setup fees |
| GPU capacity listed in Netherlands | 3 MW blocks, from Q1 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
| GPU capacity listed in United Kingdom | 3 MW to 6 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175–$250 per kW (some plus electricity), space and power |
| GPU capacity listed in Ireland | 5 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175 per kW plus electricity, space and power |
| GPU capacity listed in Spain | 10 MW blocks, from Q3 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.
Germany: priced on request; we have no Germany listing on our sheet this month. Netherlands, United Kingdom, Ireland and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.
Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.
One requirements email in, a tighter shortlist out, and a straight answer on whether Frankfurt, Amsterdam, London or Paris is the better fit.
Wholesale Frankfurt quotes usually bill electricity on top, so a per-kW rate and a US all-in rack price don’t compare until power is added.
Frankfurt has dozens of facilities run by more than 20 operators. Smaller ones often have the space a few racks need.
They tell you which Frankfurt facilities exist. They can’t tell you who has power at your size this month, or what it costs.
Send your requirements once.
We match them against providers in our network of 500+, including operators that don’t publish prices.
You get the Frankfurt options that fit, with current prices, and call the ones you pick.
You never pay us. Providers cover it.
You send the specs. We find the options. You decide.
Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.
Estimates are fine. No perfect RFP needed.
We filter our network of 500+ providers down to a few that fit, then email you their names and estimated all-in pricing for your requirements.
Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.
Line up how each Frankfurt quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.
| Cost component | How Frankfurt providers usually bill it | Benchmark |
|---|---|---|
| Space and committed power | Wholesale (250 kW and more): per kW of committed IT load. Retail racks: often a set kW with power included | About $250 per kW (wholesale benchmark) |
| Electricity | Wholesale: metered on top per kWh. Retail: often included up to the rack’s kW, with overage billed | €0.13–0.17 per kWh before VAT for large business users (Eurostat, H1 2026); €0.35–0.40 on published rack rates |
| Cross-connects and DE-CIX | Per connection a month plus a one-time fee; DE-CIX ports are priced separately | On request |
| Remote hands | Hourly, often with a monthly bundle of hours | On request |
| VAT | Rack colocation sold to a non-German business normally carries no German VAT; a dedicated cage can count as property and carry 19% | 0% or 19% |
| Currency and term | Quoted in euros; some providers bill US dollars. Retail deals often run 1–3 years, wholesale 5–10 years or more (CBRE) | Ask for both currencies |
Your customers or data are in the EU, you need DE-CIX and the networks of central Europe, or you trade on Eurex and Xetra.
If the workload can sit elsewhere in Europe, price Amsterdam or Paris too: both benchmark lower per kW. London if your users are in the UK.
We compare Frankfurt with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.
Frankfurt’s densest cluster: Digital Realty’s FRA1–FRA16 campus, Equinix FR2, NTT, Colt and firstcolo, most of them on DE-CIX’s list of enabled sites. Start here when interconnection leads.
Kleyerstraße (Telehouse, Equinix FR5), Lärchenstraße (Equinix FR4, FR6 and FR8) and Eschborner Landstraße (Global Switch, NTT Frankfurt 1). Carrier-dense, with finance and network tenants.
CyrusOne’s and Digital Realty’s Sossenheim buildings, Iron Mountain FRA-2 at Am Martinszehnten (up to 20 kW per rack) and nLighten in Eschborn. Suites, room to grow and a second site off the eastern cluster.
Large campuses such as NTT Frankfurt 3 and 4 and Digital Realty FRA33, outside the city and close to the airport. Worth pricing for larger deployments or a recovery site.
Newer hyperscale campuses; maincubes FRA04 in Dietzenbach builds racks of 40 kW and more with liquid-to-chip cooling. A place to look for dense GPU deployments.
The Netherlands is about 11 ms away, Paris 12 ms and London 16 ms (Azure round-trip medians, July 2026), and Amsterdam, Paris and London all benchmark below Frankfurt per kW. Worth a look when your users, data rules and latency budget allow it.
Since 2022 the city has steered new third-party data centers into seven zones: Sossenheim, Rödelheim, Griesheim, Gallus, Ostend, Fechenheim and Seckbach. Newer campuses sit just outside the city line.
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Digital Realty FRA1–FRA16 | Digital Realty | Frankfurt-Ostend | Hanauer Landstraße 296a–310 and Weismüllerstraße | Interconnection campus, single cabinets to multi-MW suites; DE-CIX |
| Equinix FR2 and FR13 | Equinix | Frankfurt-Seckbach | Kruppstraße 121–127; Friesstraße 9 | Interconnection; DE-CIX; Eurex and Xetra colocation (FR2) |
| NTT DATA Frankfurt 2 | NTT DATA | Frankfurt-Ostend | Hanauer Landstraße 320 | Carrier-neutral, 1.1 MW; DE-CIX |
| Colt Frankfurt City | Colt DCS | Frankfurt-Ostend | Hanauer Landstraße 326 | Enterprise colocation, 1.2 MW; DE-CIX |
| firstcolo Werkhaus and AOC | firstcolo | Frankfurt-Seckbach / Ostend | Kruppstraße 105; Hanauer Landstraße 291b | Retail colocation from single racks; DE-CIX |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix FR5 | Equinix | Frankfurt-Gallus | Kleyerstraße 90 | Interconnection; DE-CIX |
| Telehouse Frankfurt | Telehouse (KDDI) | Frankfurt-Gallus | Kleyerstraße 79–89 | Carrier-dense multi-building campus; DE-CIX |
| Equinix FR7 | Equinix | Frankfurt-Gutleutviertel | Gutleutstraße 310 | Network-dense colocation for financial services; DE-CIX |
| Equinix FR4, FR6 and FR8 | Equinix | Frankfurt-Griesheim | Lärchenstraße 110 and 141 | Interconnection campus; DE-CIX |
| Global Switch Frankfurt North and South | Global Switch | Frankfurt-Rödelheim | Eschborner Landstraße 110 | Two carrier-neutral buildings, 12 and 10 MW; DE-CIX |
| NTT DATA Frankfurt 1 | NTT DATA | Frankfurt-Rödelheim | Eschborner Landstraße 100 | Seven buildings, 70.1 MW of critical IT load; DE-CIX |
| CyrusOne FRA1 and FRA2 | CyrusOne | Frankfurt-Sossenheim | Leonhard-Heißwolf-Straße 4 | Wholesale and enterprise suites; DE-CIX |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Iron Mountain FRA-2 | Iron Mountain | Frankfurt (Am Martinszehnten) | Heinrich-Lanz-Allee 47 | Enterprise colocation, 11 MW, up to 20 kW per rack; DE-CIX |
| nLighten FRA1 | nLighten | Eschborn | Schwalbacher Straße 60–62 | Edge colocation, 2.4 MW; up to 15 kW per cabinet on air, denser on request |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| NTT DATA Frankfurt 3 | NTT DATA | Rüsselsheim am Main | Karl-Landsteiner-Ring 4 | Six data centers, 60.5 MW of IT load |
| NTT DATA Frankfurt 4 | NTT DATA | Hattersheim am Main | Voltastraße 15 | 34.4 MW now, 70.4 MW at full build-out; DE-CIX |
| Digital Realty FRA33 | Digital Realty | Hattersheim am Main | Mainzer Landstraße 500 | Single cabinets to full suites, near the airport |
| maincubes FRA04 | maincubes | Dietzenbach | Assar-Gabrielsson-Straße 11–13 | Hyperscale; racks of 40 kW and more, air, liquid-to-chip or hybrid cooling |
A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); “DE-CIX” marks sites on DE-CIX’s own list of enabled Frankfurt data centers. We also work with Frankfurt-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.
Different workloads. The same need for power, interconnection and clear commercial terms.
Frankfurt suits companies serving EU users from the EU, financial firms close to the exchanges, and networks that peer at DE-CIX. Match your workload to the power, cooling and data rules you need, then compare the full cost.

EU hosting for customers and contracts that ask where their data lives.
Low latency to Eurex and Xetra, and the audit evidence regulators ask for.
Peering at DE-CIX Frankfurt, where almost 1,100 networks connect, and reach into central and eastern Europe.
Dense racks in the EU where usable kW, cooling and electricity terms are confirmed in writing.
European production workloads with redundancy, remote hands and room to grow.
A European recovery site, priced against Amsterdam, London or Paris.
German and EU rules decide part of what you pay for, and what you can ask a provider to prove.
GDPR doesn’t require EU hosting: data can leave the EU with safeguards such as the EU–US Data Privacy Framework, which the EU General Court upheld on 3 September 2025 (an appeal is pending). Many EU customers still ask for EU hosting in their contracts, which is why US companies colocate here.
Data centers of 300 kW and up must run on 50% renewable electricity now and 100% from 1 January 2027, and sites opening from 1 July 2026 need a PUE of 1.2 and must reuse at least 10% of their energy. Colocation operators must show each customer its annual energy use. A government bill before the Bundestag would move the 100% date to 2030, so check the status before you sign.
Germany’s NIS2 law, in force since 6 December 2025, covers data center service providers, and colocation sites with 3.5 MW or more of contracted power count as critical infrastructure. Ask for the provider’s registration and audit evidence.
Rack colocation sold to a business outside Germany normally carries no German VAT; a dedicated cage with exclusive access can count as property and carry 19%.
Sources: EnEfG § 11 and the amendment bill (first reading 24 September 2026, no final vote by 25 November 2026); BSI on the NIS2 law; BSI-KritisV, Annex 4; CJEU C-215/19 on VAT. A summary, not legal advice.
“Prices in Frankfurt move month to month. Tell me what you’re deploying and I’ll come back with what’s available now and what it costs.”
Bob Spiegel, Founder, QuoteColo