Wholesale Paris quotes usually bill electricity on top, in euros, so a per-kW rate and a US all-in rack price don’t compare until power is added.
Paris colocation is about France-IX, low-carbon power, and a grid that new sites have to queue for.
Send us your specs and we’ll email matched Paris options with this month’s prices and terms, plus London or Amsterdam when they fit better.
Free for you: providers pay us. Questions first? Call (888) 400-5732.


“Paris prices below London and Frankfurt, and its power is mostly nuclear. The queue for new grid connections is long, so space that’s already built goes first.”
— Bob Spiegel, Founder, QuoteColo
Clients helped since 2004
Providers, including Paris-area operators
For buyers: providers pay us
Prices and terms in writing, no sales calls
Wholesale colocation in Paris benchmarks at $175–205 per kW a month (CBRE, Q1 2026), below London and Frankfurt. CBRE put vacancy at 6.7% in Q1 2026 and expects record take-up of 138 MW this year, driven by hyperscalers, sovereign cloud and AI. Single racks and small deployments price higher per kW.
Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.
These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.
Match the facility to the exact hardware and usable power you need, then compare it with the European capacity already listed on our desk.
| Deployment | Usable power | What we check | Price USD / month |
|---|---|---|---|
| High-density rack | 15–20 kW per rack, enough for one B300-class server | Cooling and A/B power at your density | On request: call to confirm |
| Liquid-cooled or 20 kW+ per server | Your total kW and kW per rack | Installed liquid cooling, not “liquid-ready” | Case by case, higher setup fees |
| GPU capacity listed in United Kingdom | 3 MW to 6 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175–$250 per kW (some plus electricity), space and power |
| GPU capacity listed in Netherlands | 3 MW blocks, from Q1 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
| GPU capacity listed in Ireland | 5 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175 per kW plus electricity, space and power |
| GPU capacity listed in Spain | 10 MW blocks, from Q3 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.
France: priced on request; we have no France listing on our sheet this month. United Kingdom, Netherlands, Ireland and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.
Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.
One requirements email in, a tighter shortlist out, and a straight answer on whether Paris, London or Amsterdam is the better fit.
Wholesale Paris quotes usually bill electricity on top, in euros, so a per-kW rate and a US all-in rack price don’t compare until power is added.
Paris has dozens of facilities from the northern suburbs to Essonne. Smaller operators often have the space a few racks need.
They tell you which Paris facilities exist. They can’t tell you who has power at your size this month, or what it costs.
Send your requirements once.
We match them against providers in our network of 500+, including operators that don’t publish prices.
You get the Paris options that fit, with current prices, and call the ones you pick.
You never pay us. Providers cover it.
You send the specs. We find the options. You decide.
Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.
Estimates are fine. No perfect RFP needed.
We filter our network of 500+ providers down to a few that fit, then email you their names and estimated all-in pricing for your requirements.
Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.
Line up how each Paris quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.
| Cost component | How Paris providers usually bill it | Benchmark |
|---|---|---|
| Space and committed power | Wholesale (250 kW and more): per kW of committed IT load. Retail racks: often a set kW with power included | $175–205 per kW (wholesale benchmark) |
| Electricity | Wholesale: metered on top per kWh. Retail: often included up to the rack’s kW, with overage billed | About €0.157 per kWh before VAT for 500–2,000 MWh a year (Eurostat, H1 2026) |
| Cross-connects and France-IX | Per connection a month plus a one-time fee; France-IX ports are priced separately | On request |
| Remote hands | Hourly, often with a monthly bundle of hours | On request |
| VAT | Colocation without exclusive use of space is a service, not a lease (CJEU C-215/19). Check how your contract is treated with a tax adviser | 20% standard rate |
| Currency and term | Quoted in euros; some providers bill US dollars. Retail deals often run 1–3 years, wholesale 5–10 years or more (CBRE) | Ask for both currencies |
Your customers or data are in France or the EU, you need France-IX, health data hosting (HDS), or low-carbon power for your emissions targets.
If the workload can sit elsewhere in Europe, price Amsterdam too: it benchmarks lower per kW and is about 13 ms away. London is about 10 ms away if your users are in the UK.
We compare Paris with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.
The interconnection-dense north: Equinix’s Saint-Denis campus (PA2, PA3, PA10), PA5 and PA6, and Digital Realty PAR1–PAR3, PAR5 and Paris Digital Park. Several are France-IX access sites; PA10 offers direct-to-chip cooling.
Telehouse TH2 Paris Voltaire in the 11th arrondissement, the core site of France-IX. Start here when interconnection leads.
Equinix PA7 near La Défense, Global Switch’s four-building Clichy campus, certified by NVIDIA for liquid-cooled systems, and Digital Realty PAR4.
Larger campuses where power is easier to get: OpCore in Vitry, Data4 Paris-Saclay, Digital Realty PAR13, CyrusOne in Wissous and Telehouse Magny, whose 3 MW AI module has direct liquid cooling.
Mistral AI’s 44 MW site at Bruyères-le-Châtel and the planned Campus IA at Fouju, east of Paris, which has a grid contract for 240 MW by the end of 2027. Built for large AI tenants rather than racks.
London is about 10 ms away, Frankfurt 12 ms, the Netherlands 13 ms and Ireland 19 ms (Azure round-trip medians, July 2026). Amsterdam benchmarks lower per kW; London and Frankfurt higher.
CBRE counted about 667 MW of colocation capacity in Paris in Q1 2026, up 85 MW in a year, making it Europe’s third-largest market. Interconnection clusters in the northern suburbs and central Paris; the larger campuses sit to the south.
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix PA2, PA3 and PA10 | Equinix | Saint-Denis | 114 rue Ambroise Croizat, 93200 | Interconnection campus; direct-to-chip cooling at PA10; France-IX (PA3) |
| Equinix PA4 | Equinix | Pantin | 110 bis avenue du Général Leclerc, 93500 | Retail interconnection |
| Equinix PA5 and PA6 | Equinix | Aubervilliers | 45 avenue Victor Hugo; 10 rue Waldeck Rochet, 93300 | Interconnection; France-IX (PA6) |
| Digital Realty PAR1 and PAR2 | Digital Realty | Aubervilliers | 45 avenue Victor Hugo; 20–22 rue des Gardinoux, 93300 | Carrier-neutral colocation on the Paris dark-fibre ring; France-IX (PAR2) |
| Digital Realty PAR3 and PAR5 | Digital Realty | Saint-Denis | 9 and 11–13 avenue des Arts et Métiers, 93200 | Single cabinets to multi-MW suites; France-IX (PAR5) |
| Digital Realty Paris Digital Park (PAR7–PAR11) | Digital Realty | La Courneuve | 1–3 rue Rateau; 2 and 3 avenue Marcel Cachin, 93120 | Large campus of connected data centers |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Telehouse TH2 Paris Voltaire | Telehouse (KDDI) | Paris 11e | 137 boulevard Voltaire, 75011 | Core France-IX site; a new 600 kW floor due at the end of 2026; France-IX |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix PA7 | Equinix | Courbevoie (La Défense) | Energy Park, 130–136 boulevard de Verdun, 92400 | Interconnection; France-IX |
| Global Switch Paris | Global Switch | Clichy | 7–9 rue Petit, 92582 | Four buildings of 17–24 MW; NVIDIA DGX-Ready, liquid-cooled high density |
| Digital Realty PAR4 | Digital Realty | Nanterre | 21 rue du Port, 92000 | Colocation, 41,000 ft² |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| OpCore DC2 and DC3 | OpCore | Vitry-sur-Seine | 29 rue Edith Cavell; 61 rue Julian Grimau, 94400 | Carrier-neutral, 30+ operators; HDS; France-IX |
| Data4 Paris-Saclay | Data4 | Nozay and Marcoussis | 3 route de Marcoussis, 91620 Nozay | Wholesale and hyperscale campus, 505 MW in total; direct liquid cooling; France-IX |
| Digital Realty PAR13 | Digital Realty | Les Ulis | 14 rue de l’Orme à Moineaux, 91940 | Colocation, 180,500 ft² |
| CyrusOne PAR1 | CyrusOne | Wissous | 1 boulevard Arago, 91320 | 27 MW planned in three phases |
| Telehouse TH3 Paris Magny | Telehouse (KDDI) | Magny-les-Hameaux | 1 rue Pablo Picasso, 78114 | Campus with a 3 MW direct-liquid-cooled AI module; France-IX |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| OpCore DC5 | OpCore | Saint-Ouen-l’Aumône | 25 rue de l’Eguillette, 95310 | Private suites from 1 to 16.2 MW; high density, OCP-ready |
| Digital Realty PAR12 | Digital Realty | Ferrières-en-Brie | 16 avenue Joseph Froelicher, 77164 | 30 km east of Paris, near the A4 |
A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); “France-IX” marks sites on France-IX’s own list of Paris access points. We also work with Paris-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.
Different workloads. The same need for power, interconnection and clear commercial terms.
Paris suits companies serving French and EU users, health and public-sector workloads with French certification needs, and AI teams that want low-carbon power. Match your workload to the power, cooling and data rules you need, then compare the full cost.

Hosting in France for customers and contracts that ask where their data lives.
Health data with an HDS-certified host; major Paris operators hold HDS for their buildings.
Peering at France-IX, where 505 networks connect in Paris.
Dense racks on low-carbon power, where usable kW and cooling are confirmed in writing.
European production workloads with redundancy, remote hands and room to grow.
A European recovery site, priced against London, Amsterdam or Frankfurt.
French and EU rules decide part of what you pay for, and what you can ask a provider to prove.
Health data about French patients must sit with an HDS-certified host, and under the 2024 rules the physical hosting must be in the European Economic Area. Equinix, Digital Realty and OpCore list HDS certification for their Paris buildings.
Public-sector and other sensitive workloads may require a cloud service qualified under ANSSI’s SecNumCloud. It labels the cloud provider, not the building, so it matters when you buy cloud services on top of colocation.
Data you place in Paris is under GDPR and stays in the EU. Transfers to US companies certified under the EU–US Data Privacy Framework are allowed; the EU General Court upheld the framework on 3 September 2025 and an appeal is pending.
France had not finished putting NIS2 into law by late November 2026: the bill passed the Assemblée nationale on 17 November 2026 and still needs a joint committee. French VAT is 20%.
Sources: Sénat file on the NIS2 bill; CMS on the 2024 HDS rules; BOFiP on the VAT rate; government guide to siting data centers (November 2025). A summary, not legal or tax advice.
“Prices in Paris move month to month. Tell me what you’re deploying and I’ll come back with what’s available now and what it costs.”