Paris colocation is about France-IX, low-carbon power, and a grid that new sites have to queue for.

Compare Data Centers & Prices in Paris

Send us your specs and we’ll email matched Paris options with this month’s prices and terms, plus London or Amsterdam when they fit better.

Free for you: providers pay us. Questions first? Call (888) 400-5732.

Paris rooftops and the Seine with the Eiffel Tower in the distance on a grey morning
Bob Spiegel

“Paris prices below London and Frankfurt, and its power is mostly nuclear. The queue for new grid connections is long, so space that’s already built goes first.”

— Bob Spiegel, Founder, QuoteColo

5,000+

Clients helped since 2004

500+

Providers, including Paris-area operators

Free

For buyers: providers pay us

Email

Prices and terms in writing, no sales calls

Paris colocation prices (2026 benchmarks)

Wholesale colocation in Paris benchmarks at $175–205 per kW a month (CBRE, Q1 2026), below London and Frankfurt. CBRE put vacancy at 6.7% in Q1 2026 and expects record take-up of 138 MW this year, driven by hyperscalers, sovereign cloud and AI. Single racks and small deployments price higher per kW.

  • ParisFrance; average $190
    $175–205 per kW
  • FrankfurtGermany; average $250
    $235–265 per kW
  • LondonUnited Kingdom; average $213
    $195–230 per kW
  • AmsterdamNetherlands; average $180
    $165–195 per kW

Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.

Prices change every month

These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.

Call (888) 400-5732
  • Wholesale deals of 250 kW and more usually bill power separately; smaller retail deals are often power-inclusive (CBRE). Ask which model each quote uses. French businesses using 500–2,000 MWh a year paid about €0.157 per kWh before VAT in the first half of 2026, against an EU average of €0.18 (Eurostat).
  • About 95% of France’s electricity in 2025 came from nuclear and renewables, at under 20 g of CO2 per kWh (RTE), which helps tenants with emissions targets.
  • Power is the bottleneck for new sites. The government’s own guide says the Île-de-France transmission grid is saturated and that the largest connections can take six to nine years.
  • There is no published per-rack range for Paris. We price racks and cages on request, at this month’s rates, from the providers that fit your specification.

GPU & high-density colocation in Paris

Match the facility to the exact hardware and usable power you need, then compare it with the European capacity already listed on our desk.

Paris GPU and high-density options
DeploymentUsable powerWhat we checkPrice
USD / month
High-density rack15–20 kW per rack, enough for one B300-class serverCooling and A/B power at your densityOn request: call to confirm
Liquid-cooled or 20 kW+ per serverYour total kW and kW per rackInstalled liquid cooling, not “liquid-ready”Case by case, higher setup fees
GPU capacity listed in United Kingdom3 MW to 6 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175–$250 per kW (some plus electricity), space and power
GPU capacity listed in Netherlands3 MW blocks, from Q1 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power
GPU capacity listed in Ireland5 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175 per kW plus electricity, space and power
GPU capacity listed in Spain10 MW blocks, from Q3 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power

Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.

France: priced on request; we have no France listing on our sheet this month. United Kingdom, Netherlands, Ireland and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.

kW Capacity Matcher

Check GPU capacity listed now

Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.

Free, no sign-up. Matched from 14 kW; liquid cooling and servers over 20 kW are priced case by case.

Why go through QuoteColo? It’s faster

One requirements email in, a tighter shortlist out, and a straight answer on whether Paris, London or Amsterdam is the better fit.

THE DIY WAY

Compare euro quotes with US rack prices

Wholesale Paris quotes usually bill electricity on top, in euros, so a per-kW rate and a US all-in rack price don’t compare until power is added.

THE DIY WAY

Price only the biggest campuses

Paris has dozens of facilities from the northern suburbs to Essonne. Smaller operators often have the space a few racks need.

THE DIY WAY

Google, ChatGPT & ‘top 10’ lists

They tell you which Paris facilities exist. They can’t tell you who has power at your size this month, or what it costs.

How it works

You send the specs. We find the options. You decide.

STEP 1

Send your requirements.

Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.

HardwareRacks & kWLocationStart date

Estimates are fine. No perfect RFP needed.

STEP 3

Take the next step. On your terms.

Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.

  • Go directly to the providers you like
  • Ask us questions whenever you need

Our provider network

Equinix
CenterSquare
Hivelocity
Digital Realty
1547 Critical Systems Realty
Cologix
By clicking here, I state that I have read and understood the Terms and Conditions

Your rate per kW is only the starting point.

Line up how each Paris quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.

How Paris colocation is billed
Cost componentHow Paris providers usually bill itBenchmark
Space and committed powerWholesale (250 kW and more): per kW of committed IT load. Retail racks: often a set kW with power included$175–205 per kW (wholesale benchmark)
ElectricityWholesale: metered on top per kWh. Retail: often included up to the rack’s kW, with overage billedAbout €0.157 per kWh before VAT for 500–2,000 MWh a year (Eurostat, H1 2026)
Cross-connects and France-IXPer connection a month plus a one-time fee; France-IX ports are priced separatelyOn request
Remote handsHourly, often with a monthly bundle of hoursOn request
VATColocation without exclusive use of space is a service, not a lease (CJEU C-215/19). Check how your contract is treated with a tax adviser20% standard rate
Currency and termQuoted in euros; some providers bill US dollars. Retail deals often run 1–3 years, wholesale 5–10 years or more (CBRE)Ask for both currencies
Your Paris bill

Get the full monthly bill for your Paris setup

The benchmarks above show where the market sits. Send your racks, kW, bandwidth and cross-connects, and we’ll email the all-in monthly cost from the Paris providers that fit, electricity and extras included, at this month’s prices.

Free for you: providers pay us. Options by email within 48 hours.

Is Paris right for your workload?

A strong fit

Your customers or data are in France or the EU, you need France-IX, health data hosting (HDS), or low-carbon power for your emissions targets.

Compare another market

If the workload can sit elsewhere in Europe, price Amsterdam too: it benchmarks lower per kW and is about 13 ms away. London is about 10 ms away if your users are in the UK.

We’ll tell you which

We compare Paris with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.

Where to land in Paris and why

  1. North: Saint-Denis, Aubervilliers and La Courneuve

    The interconnection-dense north: Equinix’s Saint-Denis campus (PA2, PA3, PA10), PA5 and PA6, and Digital Realty PAR1–PAR3, PAR5 and Paris Digital Park. Several are France-IX access sites; PA10 offers direct-to-chip cooling.

  2. Central Paris: Voltaire

    Telehouse TH2 Paris Voltaire in the 11th arrondissement, the core site of France-IX. Start here when interconnection leads.

  3. West: Courbevoie, Clichy and Nanterre

    Equinix PA7 near La Défense, Global Switch’s four-building Clichy campus, certified by NVIDIA for liquid-cooled systems, and Digital Realty PAR4.

  4. South: Vitry, Les Ulis, Nozay and Magny

    Larger campuses where power is easier to get: OpCore in Vitry, Data4 Paris-Saclay, Digital Realty PAR13, CyrusOne in Wissous and Telehouse Magny, whose 3 MW AI module has direct liquid cooling.

  5. New AI sites further out

    Mistral AI’s 44 MW site at Bruyères-le-Châtel and the planned Campus IA at Fouju, east of Paris, which has a grid contract for 240 MW by the end of 2027. Built for large AI tenants rather than racks.

  6. Your Plan B market

    London is about 10 ms away, Frankfurt 12 ms, the Netherlands 13 ms and Ireland 19 ms (Azure round-trip medians, July 2026). Amsterdam benchmarks lower per kW; London and Frankfurt higher.

Paris data centers

CBRE counted about 667 MW of colocation capacity in Paris in Q1 2026, up 85 MW in a year, making it Europe’s third-largest market. Interconnection clusters in the northern suburbs and central Paris; the larger campuses sit to the south.

North and north-east

North and north-east data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix PA2, PA3 and PA10EquinixSaint-Denis114 rue Ambroise Croizat, 93200Interconnection campus; direct-to-chip cooling at PA10; France-IX (PA3)
Equinix PA4EquinixPantin110 bis avenue du Général Leclerc, 93500Retail interconnection
Equinix PA5 and PA6EquinixAubervilliers45 avenue Victor Hugo; 10 rue Waldeck Rochet, 93300Interconnection; France-IX (PA6)
Digital Realty PAR1 and PAR2Digital RealtyAubervilliers45 avenue Victor Hugo; 20–22 rue des Gardinoux, 93300Carrier-neutral colocation on the Paris dark-fibre ring; France-IX (PAR2)
Digital Realty PAR3 and PAR5Digital RealtySaint-Denis9 and 11–13 avenue des Arts et Métiers, 93200Single cabinets to multi-MW suites; France-IX (PAR5)
Digital Realty Paris Digital Park (PAR7–PAR11)Digital RealtyLa Courneuve1–3 rue Rateau; 2 and 3 avenue Marcel Cachin, 93120Large campus of connected data centers

Central Paris

Central Paris data center directory
Facility / service locationOperatorLocationAddressFocus
Telehouse TH2 Paris VoltaireTelehouse (KDDI)Paris 11e137 boulevard Voltaire, 75011Core France-IX site; a new 600 kW floor due at the end of 2026; France-IX

West

West data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix PA7EquinixCourbevoie (La Défense)Energy Park, 130–136 boulevard de Verdun, 92400Interconnection; France-IX
Global Switch ParisGlobal SwitchClichy7–9 rue Petit, 92582Four buildings of 17–24 MW; NVIDIA DGX-Ready, liquid-cooled high density
Digital Realty PAR4Digital RealtyNanterre21 rue du Port, 92000Colocation, 41,000 ft²

South

South data center directory
Facility / service locationOperatorLocationAddressFocus
OpCore DC2 and DC3OpCoreVitry-sur-Seine29 rue Edith Cavell; 61 rue Julian Grimau, 94400Carrier-neutral, 30+ operators; HDS; France-IX
Data4 Paris-SaclayData4Nozay and Marcoussis3 route de Marcoussis, 91620 NozayWholesale and hyperscale campus, 505 MW in total; direct liquid cooling; France-IX
Digital Realty PAR13Digital RealtyLes Ulis14 rue de l’Orme à Moineaux, 91940Colocation, 180,500 ft²
CyrusOne PAR1CyrusOneWissous1 boulevard Arago, 9132027 MW planned in three phases
Telehouse TH3 Paris MagnyTelehouse (KDDI)Magny-les-Hameaux1 rue Pablo Picasso, 78114Campus with a 3 MW direct-liquid-cooled AI module; France-IX

North-west and east

North-west and east data center directory
Facility / service locationOperatorLocationAddressFocus
OpCore DC5OpCoreSaint-Ouen-l’Aumône25 rue de l’Eguillette, 95310Private suites from 1 to 16.2 MW; high density, OCP-ready
Digital Realty PAR12Digital RealtyFerrières-en-Brie16 avenue Joseph Froelicher, 7716430 km east of Paris, near the A4

A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); “France-IX” marks sites on France-IX’s own list of Paris access points. We also work with Paris-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.

Who colocates in Paris

Different workloads. The same need for power, interconnection and clear commercial terms.

France’s main colocation market

Paris suits companies serving French and EU users, health and public-sector workloads with French certification needs, and AI teams that want low-carbon power. Match your workload to the power, cooling and data rules you need, then compare the full cost.

A concrete and dark-steel data center with rooftop plant behind a secure gate in a business park outside Paris

US SaaS with French customers

Hosting in France for customers and contracts that ask where their data lives.

Healthcare and health tech

Health data with an HDS-certified host; major Paris operators hold HDS for their buildings.

Networks and content providers

Peering at France-IX, where 505 networks connect in Paris.

AI / GPU teams

Dense racks on low-carbon power, where usable kW and cooling are confirmed in writing.

Enterprise IT

European production workloads with redundancy, remote hands and room to grow.

Recovery / secondary sites

A European recovery site, priced against London, Amsterdam or Frankfurt.

Rules that shape Paris colocation

French and EU rules decide part of what you pay for, and what you can ask a provider to prove.

Health data (HDS)

Health data about French patients must sit with an HDS-certified host, and under the 2024 rules the physical hosting must be in the European Economic Area. Equinix, Digital Realty and OpCore list HDS certification for their Paris buildings.

SecNumCloud

Public-sector and other sensitive workloads may require a cloud service qualified under ANSSI’s SecNumCloud. It labels the cloud provider, not the building, so it matters when you buy cloud services on top of colocation.

GDPR and EU data residency

Data you place in Paris is under GDPR and stays in the EU. Transfers to US companies certified under the EU–US Data Privacy Framework are allowed; the EU General Court upheld the framework on 3 September 2025 and an appeal is pending.

NIS2 and VAT

France had not finished putting NIS2 into law by late November 2026: the bill passed the Assemblée nationale on 17 November 2026 and still needs a joint committee. French VAT is 20%.

Sources: Sénat file on the NIS2 bill; CMS on the 2024 HDS rules; BOFiP on the VAT rate; government guide to siting data centers (November 2025). A summary, not legal or tax advice.

“Prices in Paris move month to month. Tell me what you’re deploying and I’ll come back with what’s available now and what it costs.”

Bob Spiegel, Founder, QuoteColo

Bob Spiegel
By clicking here, I state that I have read and understood the Terms and Conditions

Paris colocation FAQ

How much does colocation cost in Paris?
Wholesale colocation in Paris benchmarks at about $190 per kW a month ($175–205 in CBRE’s Q1 2026 survey of 250–500 kW deals), excluding electricity, which wholesale deals bill on top; smaller retail deals are often priced with power included. Single racks price higher per kW. Prices change every month, so call us at (888) 400-5732 or send your specs to confirm current prices and availability.
Is Paris more expensive than Frankfurt, London or Amsterdam?
On the same CBRE benchmark (Q1 2026, 250–500 kW), Paris sits at $175–205 per kW a month, Frankfurt at $250, London at $213 and Amsterdam at $180. Wholesale deals bill electricity on top, and its price differs by country. A cheaper market on paper can cost more once latency, data rules and travel are counted, so we price Paris and your Plan B side by side.
Why is power hard to get for new sites around Paris?
The French government’s own guide says the Île-de-France transmission grid is saturated and that the largest connections can take six to nine years. A fast-track route cuts that to three or four years for sites over 400 MW; its first contract, at Fouju east of Paris, plans 240 MW by the end of 2027. For racks and cages, space that is already built and powered is what you can get near-term.
What is France-IX, and where can I connect?
France-IX is the main French internet exchange: 505 networks connect in Paris and more than 600 across France. In Paris it is reachable in 11 data centers, including Telehouse Voltaire, Equinix PA3, PA6 and PA7, Digital Realty PAR2 and PAR5, OpCore DC2 and DC3, Telehouse Magny and Data4 Paris-Saclay.
Do I need an HDS-certified data center for health data?
Yes, if you host health data about French patients for others. HDS certification covers six activities, and the first is providing the physical site, which is what a colocation building certifies for. Equinix, Digital Realty and OpCore list HDS for their Paris sites. Your own servers and services may need certification for the other activities.
Is power in Paris low-carbon?
Largely, yes. About 95% of France’s electricity in 2025 came from nuclear and renewables, averaging under 20 g of CO2 per kWh (RTE). That helps companies with emissions targets, and French business electricity also cost less than the EU average in the first half of 2026 (Eurostat).
Can I put a dense GPU rack in Paris?
Yes, at the right site. Telehouse opened a 3 MW direct-liquid-cooled AI module at Magny in 2025, Equinix PA10 offers direct-to-chip cooling, and Global Switch’s Clichy campus is certified by NVIDIA for liquid-cooled DGX GB200 systems. Few operators publish kW per rack for Paris, so get cooling and density confirmed in writing for each hall.
Is the service free?
Yes. QuoteColo is free for buyers. Providers share their existing standard sales commission with us, so there’s no added fee or markup on your provider quote. You contract directly with the provider you choose.
How fast do I get options?
Matched options arrive by email within 48 hours once your requirements are clear, and there are no calls until you’ve reviewed them. Prices and capacity in Paris change every month, so every option comes with the current price and availability, confirmed with the provider.

Get 2–4 qualified options in 48 hours

Free for buyers

Your price is the same as going direct.

You will get all-in price estimates by email

From 500+ providers. No sales calls, no long forms.

Trusted service since 2004

5,000+ clients helped.

Your request will be sent securely to QuoteColo.