London colocation is about Europe’s largest market, LINX interconnection, and power that West London has largely run out of.

Compare Data Centers & Prices in London

Send us your specs and we’ll email matched London options with this month’s prices and terms, plus Amsterdam or Dublin when they fit better.

Free for you: providers pay us. Questions first? Call (888) 400-5732.

The City of London towers and St Paul’s Cathedral across the Thames on an overcast day
Bob Spiegel

“In London the rate matters less than where the power is. Docklands, Slough and the new sites outside the M25 all price differently, and I’ll show you each.”

— Bob Spiegel, Founder, QuoteColo

5,000+

Clients helped since 2004

500+

Providers, including London-area operators

Free

For buyers: providers pay us

Email

Prices and terms in writing, no sales calls

London colocation prices (2026 benchmarks)

Wholesale colocation in London benchmarks at $195–230 per kW a month (CBRE, Q1 2026), below Frankfurt and above Paris and Amsterdam. CBRE put London vacancy at 8.6% and expects a record low of about 5.5% by the end of 2026. Single racks and small deployments price higher per kW.

  • LondonUnited Kingdom; average $213
    $195–230 per kW
  • FrankfurtGermany; average $250
    $235–265 per kW
  • ParisFrance; average $190
    $175–205 per kW
  • AmsterdamNetherlands; average $180
    $165–195 per kW

Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.

Prices change every month

These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.

Call (888) 400-5732
  • In sterling, CBRE says pricing for 250–500 kW requirements reaches around £170 per kW a month at the top, and providers charge a premium in parts of West London near the cloud availability zones.
  • Wholesale deals of 250 kW and more usually bill power separately; smaller retail deals are often power-inclusive (CBRE), and some London operators meter all IT power. UK businesses paid an average of 24.5p per kWh before VAT in Q2 2026 (DESNZ, provisional).
  • Power is the bottleneck. Data centers along the M4 corridor filled the grid in Hillingdon, Hounslow and Ealing from 2022, and CBRE expects no key West London substation upgrade before the early 2030s.
  • There is no published per-rack range for London. We price racks and cages on request, at this month’s rates, from the providers that fit your specification.

GPU & high-density colocation in London

Match the facility to the exact hardware and usable power you need, then compare it with the UK and European capacity already listed on our desk.

London GPU and high-density options
DeploymentUsable powerWhat we checkPrice
USD / month
High-density rack15–20 kW per rack, enough for one B300-class serverCooling and A/B power at your densityOn request: call to confirm
Liquid-cooled or 20 kW+ per serverYour total kW and kW per rackInstalled liquid cooling, not “liquid-ready”Case by case, higher setup fees
GPU capacity listed in United Kingdom3 MW to 6 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175–$250 per kW (some plus electricity), space and power
GPU capacity listed in Netherlands3 MW blocks, from Q1 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power
GPU capacity listed in Ireland5 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175 per kW plus electricity, space and power
GPU capacity listed in Spain10 MW blocks, from Q3 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power

Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.

United Kingdom, Netherlands, Ireland and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.

kW Capacity Matcher

Check GPU capacity listed now

Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.

Free, no sign-up. Matched from 14 kW; liquid cooling and servers over 20 kW are priced case by case.

Why go through QuoteColo? It’s faster

One requirements email in, a tighter shortlist out, and a straight answer on whether London, Amsterdam or Dublin is the better fit.

THE DIY WAY

Compare sterling quotes with US rack prices

London wholesale quotes usually bill electricity separately, in pounds, so a per-kW rate and a US all-in rack price don’t compare until power and currency are on the same basis.

THE DIY WAY

Price only the biggest campuses

London has dozens of operators across the Docklands, Slough and West London. Smaller ones often have the space a few racks need.

THE DIY WAY

Google, ChatGPT & ‘top 10’ lists

They tell you which London facilities exist. They can’t tell you who has power at your size this month, or what it costs.

How it works

You send the specs. We find the options. You decide.

STEP 1

Send your requirements.

Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.

HardwareRacks & kWLocationStart date

Estimates are fine. No perfect RFP needed.

STEP 3

Take the next step. On your terms.

Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.

  • Go directly to the providers you like
  • Ask us questions whenever you need

Our provider network

Equinix
CenterSquare
Hivelocity
Digital Realty
1547 Critical Systems Realty
Cologix
By clicking here, I state that I have read and understood the Terms and Conditions

Your rate per kW is only the starting point.

Line up how each London quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.

How London colocation is billed
Cost componentHow London providers usually bill itBenchmark
Space and committed powerWholesale (250 kW and more): per kW of committed IT load. Retail racks: often a set kW with power included$195–230 per kW (wholesale benchmark)
ElectricityWholesale: metered on top per kWh. Retail: often included up to the rack’s kW, with overage billedUK business average 24.5p per kWh before VAT (DESNZ, Q2 2026)
Cross-connects and LINXPer connection a month plus a one-time fee; LINX ports are priced separatelyOn request
Remote handsHourly, often with a monthly bundle of hoursOn request
VATUK quotes are usually before VAT. How it applies to a buyer outside the UK depends on the contract, so check with a tax adviser20% standard rate
Currency and termQuoted in pounds; some providers bill US dollars. Retail deals often run 1–3 years, wholesale 5–10 years or more (CBRE)Ask for both currencies
Your London bill

Get the full monthly bill for your London setup

The benchmarks above show where the market sits. Send your racks, kW, bandwidth and cross-connects, and we’ll email the all-in monthly cost from the London providers that fit, electricity and extras included, at this month’s prices.

Free for you: providers pay us. Options by email within 48 hours.

Is London right for your workload?

A strong fit

Your users or customers are in the UK, you need LINX and the Docklands carriers, or you trade in the financial ecosystem around Slough.

Compare another market

If the workload can sit elsewhere in Europe, price Amsterdam or Paris too: both benchmark lower per kW and are about 11 ms away. Dublin when you want a second English-speaking site in the EU.

We’ll tell you which

We compare London with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.

Where to land in London and why

  1. Docklands and East London

    London’s interconnection core: the Telehouse campus, LINX’s home since 1994, plus Equinix LD8, Digital Realty and Global Switch. Start here when you need many networks and carriers.

  2. City fringe

    Digital Realty’s Hanbury Street campus in E1, close to the City, for network- and cloud-dense deployments.

  3. Slough Trading Estate

    West of Heathrow: Equinix LD4–LD6 and LD10, home of a large financial trading ecosystem, plus CyrusOne, Iron Mountain, Kao Data and VIRTUS. Close to the cloud availability zones, but power here is tight.

  4. West London: Park Royal, Hayes and Stockley Park

    Equinix LD3 and LD9, Ark Union Park, VIRTUS and Colt. The grid in Hillingdon, Hounslow and Ealing has been full since 2022, so new power here comes slowly.

  5. East London and beyond the M25

    Newer and larger campuses at the edge of the metro: NTT London 1 in Dagenham, Kao Data in Harlow and Ark in Chertsey. CBRE says sites now planned outside the M25 should reach the market in 2028–2029.

  6. Your Plan B market

    Paris and the Netherlands are about 11 ms away, Ireland 12 ms and Frankfurt 17 ms (Azure round-trip medians, July 2026), and Amsterdam and Paris benchmark below London per kW. Worth a look when your users, data rules and latency budget allow it.

London data centers

CBRE counted 1,338 MW of colocation capacity in London in Q1 2026, the largest market in Europe and 21% more than a year earlier. Most of it sits in two hubs, the Docklands and Slough, with West London in between.

Docklands and East London

Docklands and East London data center directory
Facility / service locationOperatorLocationAddressFocus
Telehouse North, North Two, East and WestTelehouse (KDDI)London DocklandsCoriander Avenue, E14 2AALINX’s primary home since 1994; on-campus 132 kV substation at North Two; LINX
Telehouse SouthTelehouse (KDDI)Blackwall Yard, Docklands1 Blackwall Way, Paul Julius Close, E14 2EH18 MW, opened 2022; liquid cooling test lab; LINX
Equinix LD8EquinixDocklands (Limeharbour)6–9 Harbour Exchange Square, E14 9GEInterconnection for financial services, ISPs, cloud and content; LINX
Digital Realty LHR20 (Sovereign House)Digital RealtyLondon Docklands227 Marsh Wall, E14 9SDCarrier-neutral, single cabinets to multi-MW suites; LINX
Digital Realty LHR19 (Cloud House)Digital RealtyLondon DocklandsCloud House, E14 9SZHome of Digital Realty’s European Innovation Lab for AI and HPC; LINX
Global Switch London East and NorthGlobal SwitchLondon Docklands3 Nutmeg Lane, E14 2AX; 240 East India Dock Road, E14 9YYCarrier-neutral, 87 MW and 18 MW; liquid cooling showcase
NTT DATA London 1NTT DATADagenhamYew Tree Avenue, RM10 7FZ32 MW of IT load now, 64 MW at full build; on-site 80 MVA substation

City fringe

City fringe data center directory
Facility / service locationOperatorLocationAddressFocus
Digital Realty LON1–LON3Digital RealtyCity fringe (E1)11 Hanbury Street, E1 6QRNetwork- and cloud-dense colocation; LINX

Slough

Slough data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix LD4, LD5 and LD6EquinixSlough Trading Estate2, 8 and 352 Buckingham Avenue, SL1Interconnection and the financial trading ecosystem; direct-to-chip cooling at LD5; LINX
Equinix LD10 and LD7EquinixSlough13 Liverpool Road, SL1 4QZ; 1 Banbury Avenue, SL1 4LHInterconnection and colocation; LINX at LD10
CyrusOne LON1CyrusOneSlough12 Liverpool Road, SL1 4QZAbout 9 MW of IT load; all IT power metered
Iron Mountain LON-1Iron MountainSlough724–729 Dundee Road, SL1 4JU8.75 MW; high density up to 15 kW per rack, on review; LINX
Kao Data KLON-06Kao DataSlough Trading Estate672 Galvin Road, SL1 4AN20 MW, Tier III equivalent

West London

West London data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix LD3 and LD9EquinixPark RoyalCoronation Road, NW10 7PH; 2 Powergate Business Park, Volt Avenue, NW10 6PWInterconnection; LD9 has 165,463 ft² of colocation space
Ark Union ParkArk Data CentresHayesBulls Bridge Industrial Estate, UB3 4DG99 MW across four data centers

Outer London

Outer London data center directory
Facility / service locationOperatorLocationAddressFocus
Pulsant Croydon LN-1PulsantCroydonUnit 1, 35 Imperial Way, CR0 4RRRegional edge site; racks up to 30 kW
Kao Data Harlow campusKao DataHarlow, EssexLondon Road, CM17 9NAKLON-03 with hybrid direct-to-chip cooling, racks up to 130 kW; NVIDIA DGX-Ready
Ark Longcross ParkArk Data CentresChertsey, SurreyKT16 0EE54 MW across two data centers; liquid and air cooling

A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); “LINX” marks sites on LINX’s own network maps (October 2026). We also work with London-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.

Who colocates in London

Different workloads. The same need for power, interconnection and clear commercial terms.

Europe’s largest colocation market

London suits companies serving UK users from the UK, financial firms that need the trading ecosystem in Slough and the City, and networks that peer at LINX. Match your workload to the power, cooling and data rules you need, then compare the full cost.

A dark-clad data center with rooftop cooling plant and a fenced yard beside the Thames in east London

US SaaS with UK customers

UK hosting for customers and contracts that ask where their data lives.

Banks and trading firms

Low latency to the City and the trading ecosystem in Slough, with the audit evidence regulators ask for.

Networks and content providers

Peering at LINX, where more than 780 networks connect to its main London platform.

AI / GPU teams

Dense racks near London where usable kW, cooling and electricity terms are confirmed in writing.

Enterprise IT

UK production workloads with redundancy, remote hands and room to grow.

Recovery / secondary sites

A UK recovery site, priced against Amsterdam, Dublin or Paris.

Rules that shape London colocation

UK rules decide part of what you pay for, and what you can ask a provider to prove.

UK GDPR and data transfers

Personal data can move freely between the EU and the UK: the EU renewed the UK’s adequacy status in December 2025, until 27 December 2031. Transfers to certified US companies are covered by the UK–US data bridge, in force since October 2023.

Critical national infrastructure

The UK classed data centers as Critical National Infrastructure in September 2024. The sector gets a dedicated government team and priority access to the National Cyber Security Centre in an incident.

Cyber Security and Resilience Bill

A new cyber law is in its final stage in Parliament. As proposed, it brings third-party data centers of 1 MW and up under Ofcom’s supervision, with incident reports within 24 hours. Check its status before you sign.

VAT

UK quotes are usually before VAT, and the standard rate is 20%. How VAT applies to a buyer outside the UK depends on the contract, so ask a tax adviser.

Sources: European Commission on UK adequacy; UK–US data bridge; data centers as critical national infrastructure; Cyber Security and Resilience Bill (at the Lords amendments stage on 24 November 2026); UK VAT rates. A summary, not legal or tax advice.

“Prices in London move month to month. Tell me what you’re deploying and where your users are, and I’ll come back with the sites that have room now and what they cost.”

Bob Spiegel, Founder, QuoteColo

Bob Spiegel
By clicking here, I state that I have read and understood the Terms and Conditions

London colocation FAQ

How much does colocation cost in London?
Wholesale colocation in London benchmarks at about $213 per kW a month ($195–230 in CBRE’s Q1 2026 survey of 250–500 kW deals), excluding electricity, which wholesale deals bill on top; smaller retail deals are often priced with power included. Single racks price higher per kW. Prices change every month, so call us at (888) 400-5732 or send your specs to confirm current prices and availability.
Is London more expensive than Frankfurt, Paris or Amsterdam?
On the same CBRE benchmark (Q1 2026, 250–500 kW), London sits at $195–230 per kW a month, Frankfurt at $250, Paris at $190 and Amsterdam at $180. Wholesale deals bill electricity on top, and its price differs by country. A cheaper market on paper can cost more once latency, data rules and travel are counted, so we price London and your Plan B side by side.
Why is power hard to get in London?
West London’s grid is full. Since 2022, data centers along the M4 corridor have taken the spare capacity in Hillingdon, Hounslow and Ealing, and CBRE does not expect a key West London substation upgrade before the early 2030s. Space that already has power is what you can get near-term; new campuses are going up outside the M25, with power expected in 2028–2029.
What is LINX, and do I need a LINX-connected data center?
LINX is London’s main internet exchange: more than 780 networks connect to its main London platform, LON1, and its network maps show 17 London data centers where you can join, most of them in the Docklands and Slough. If you peer or need many networks, pick one of those sites; if you only buy transit, any well-connected facility can work.
Can EU personal data be hosted in London after Brexit?
Yes. The EU renewed the UK’s adequacy decision on 19 December 2025, so personal data can flow from the EU to the UK until 27 December 2031, when the decision can be renewed again. Transfers from the UK to certified US companies are covered by the UK–US data bridge. Some EU customers still ask for EU hosting in their contracts, so check what yours require.
Docklands or Slough: which should I choose?
The Docklands is London’s interconnection core, with the Telehouse campus where LINX started, and suits networks, content and most enterprise IT. Slough, west of Heathrow, sits close to the cloud availability zones and hosts Equinix’s financial trading ecosystem. Power is tight in both, so we price sites in each, and in the newer campuses outside the M25.
Can I put a dense GPU rack in London?
Yes, at the right site. VIRTUS offers racks of up to 80 kW in Slough and Stockley Park, Equinix LD5 offers direct-to-chip liquid cooling, and Kao Data’s KLON-03 in Harlow is specified for up to 130 kW per rack. Older Docklands halls average 1–4.5 kW per rack, so get the cooling and kW per rack confirmed in writing.
Is the service free?
Yes. QuoteColo is free for buyers. Providers share their existing standard sales commission with us, so there’s no added fee or markup on your provider quote. You contract directly with the provider you choose.
How fast do I get options?
Matched options arrive by email within 48 hours once your requirements are clear, and there are no calls until you’ve reviewed them. Prices and capacity in London change every month, so every option comes with the current price and availability, confirmed with the provider.

Get 2–4 qualified options in 48 hours

Free for buyers

Your price is the same as going direct.

You will get all-in price estimates by email

From 500+ providers. No sales calls, no long forms.

Trusted service since 2004

5,000+ clients helped.

Your request will be sent securely to QuoteColo.