Compare sterling quotes with US rack prices
London wholesale quotes usually bill electricity separately, in pounds, so a per-kW rate and a US all-in rack price don’t compare until power and currency are on the same basis.
London colocation is about Europe’s largest market, LINX interconnection, and power that West London has largely run out of.
Send us your specs and we’ll email matched London options with this month’s prices and terms, plus Amsterdam or Dublin when they fit better.
Free for you: providers pay us. Questions first? Call (888) 400-5732.


“In London the rate matters less than where the power is. Docklands, Slough and the new sites outside the M25 all price differently, and I’ll show you each.”
— Bob Spiegel, Founder, QuoteColo
Clients helped since 2004
Providers, including London-area operators
For buyers: providers pay us
Prices and terms in writing, no sales calls
Wholesale colocation in London benchmarks at $195–230 per kW a month (CBRE, Q1 2026), below Frankfurt and above Paris and Amsterdam. CBRE put London vacancy at 8.6% and expects a record low of about 5.5% by the end of 2026. Single racks and small deployments price higher per kW.
Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.
These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.
Match the facility to the exact hardware and usable power you need, then compare it with the UK and European capacity already listed on our desk.
| Deployment | Usable power | What we check | Price USD / month |
|---|---|---|---|
| High-density rack | 15–20 kW per rack, enough for one B300-class server | Cooling and A/B power at your density | On request: call to confirm |
| Liquid-cooled or 20 kW+ per server | Your total kW and kW per rack | Installed liquid cooling, not “liquid-ready” | Case by case, higher setup fees |
| GPU capacity listed in United Kingdom | 3 MW to 6 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175–$250 per kW (some plus electricity), space and power |
| GPU capacity listed in Netherlands | 3 MW blocks, from Q1 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
| GPU capacity listed in Ireland | 5 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175 per kW plus electricity, space and power |
| GPU capacity listed in Spain | 10 MW blocks, from Q3 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.
United Kingdom, Netherlands, Ireland and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.
Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.
One requirements email in, a tighter shortlist out, and a straight answer on whether London, Amsterdam or Dublin is the better fit.
London wholesale quotes usually bill electricity separately, in pounds, so a per-kW rate and a US all-in rack price don’t compare until power and currency are on the same basis.
London has dozens of operators across the Docklands, Slough and West London. Smaller ones often have the space a few racks need.
They tell you which London facilities exist. They can’t tell you who has power at your size this month, or what it costs.
Send your requirements once.
We match them against providers in our network of 500+, including operators that don’t publish prices.
You get the London options that fit, with current prices, and call the ones you pick.
You never pay us. Providers cover it.
You send the specs. We find the options. You decide.
Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.
Estimates are fine. No perfect RFP needed.
We filter our network of 500+ providers down to a few that fit, then email you their names and estimated all-in pricing for your requirements.
Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.
Line up how each London quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.
| Cost component | How London providers usually bill it | Benchmark |
|---|---|---|
| Space and committed power | Wholesale (250 kW and more): per kW of committed IT load. Retail racks: often a set kW with power included | $195–230 per kW (wholesale benchmark) |
| Electricity | Wholesale: metered on top per kWh. Retail: often included up to the rack’s kW, with overage billed | UK business average 24.5p per kWh before VAT (DESNZ, Q2 2026) |
| Cross-connects and LINX | Per connection a month plus a one-time fee; LINX ports are priced separately | On request |
| Remote hands | Hourly, often with a monthly bundle of hours | On request |
| VAT | UK quotes are usually before VAT. How it applies to a buyer outside the UK depends on the contract, so check with a tax adviser | 20% standard rate |
| Currency and term | Quoted in pounds; some providers bill US dollars. Retail deals often run 1–3 years, wholesale 5–10 years or more (CBRE) | Ask for both currencies |
Your users or customers are in the UK, you need LINX and the Docklands carriers, or you trade in the financial ecosystem around Slough.
If the workload can sit elsewhere in Europe, price Amsterdam or Paris too: both benchmark lower per kW and are about 11 ms away. Dublin when you want a second English-speaking site in the EU.
We compare London with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.
London’s interconnection core: the Telehouse campus, LINX’s home since 1994, plus Equinix LD8, Digital Realty and Global Switch. Start here when you need many networks and carriers.
Digital Realty’s Hanbury Street campus in E1, close to the City, for network- and cloud-dense deployments.
West of Heathrow: Equinix LD4–LD6 and LD10, home of a large financial trading ecosystem, plus CyrusOne, Iron Mountain, Kao Data and VIRTUS. Close to the cloud availability zones, but power here is tight.
Equinix LD3 and LD9, Ark Union Park, VIRTUS and Colt. The grid in Hillingdon, Hounslow and Ealing has been full since 2022, so new power here comes slowly.
Newer and larger campuses at the edge of the metro: NTT London 1 in Dagenham, Kao Data in Harlow and Ark in Chertsey. CBRE says sites now planned outside the M25 should reach the market in 2028–2029.
Paris and the Netherlands are about 11 ms away, Ireland 12 ms and Frankfurt 17 ms (Azure round-trip medians, July 2026), and Amsterdam and Paris benchmark below London per kW. Worth a look when your users, data rules and latency budget allow it.
CBRE counted 1,338 MW of colocation capacity in London in Q1 2026, the largest market in Europe and 21% more than a year earlier. Most of it sits in two hubs, the Docklands and Slough, with West London in between.
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Telehouse North, North Two, East and West | Telehouse (KDDI) | London Docklands | Coriander Avenue, E14 2AA | LINX’s primary home since 1994; on-campus 132 kV substation at North Two; LINX |
| Telehouse South | Telehouse (KDDI) | Blackwall Yard, Docklands | 1 Blackwall Way, Paul Julius Close, E14 2EH | 18 MW, opened 2022; liquid cooling test lab; LINX |
| Equinix LD8 | Equinix | Docklands (Limeharbour) | 6–9 Harbour Exchange Square, E14 9GE | Interconnection for financial services, ISPs, cloud and content; LINX |
| Digital Realty LHR20 (Sovereign House) | Digital Realty | London Docklands | 227 Marsh Wall, E14 9SD | Carrier-neutral, single cabinets to multi-MW suites; LINX |
| Digital Realty LHR19 (Cloud House) | Digital Realty | London Docklands | Cloud House, E14 9SZ | Home of Digital Realty’s European Innovation Lab for AI and HPC; LINX |
| Global Switch London East and North | Global Switch | London Docklands | 3 Nutmeg Lane, E14 2AX; 240 East India Dock Road, E14 9YY | Carrier-neutral, 87 MW and 18 MW; liquid cooling showcase |
| NTT DATA London 1 | NTT DATA | Dagenham | Yew Tree Avenue, RM10 7FZ | 32 MW of IT load now, 64 MW at full build; on-site 80 MVA substation |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Digital Realty LON1–LON3 | Digital Realty | City fringe (E1) | 11 Hanbury Street, E1 6QR | Network- and cloud-dense colocation; LINX |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix LD4, LD5 and LD6 | Equinix | Slough Trading Estate | 2, 8 and 352 Buckingham Avenue, SL1 | Interconnection and the financial trading ecosystem; direct-to-chip cooling at LD5; LINX |
| Equinix LD10 and LD7 | Equinix | Slough | 13 Liverpool Road, SL1 4QZ; 1 Banbury Avenue, SL1 4LH | Interconnection and colocation; LINX at LD10 |
| CyrusOne LON1 | CyrusOne | Slough | 12 Liverpool Road, SL1 4QZ | About 9 MW of IT load; all IT power metered |
| Iron Mountain LON-1 | Iron Mountain | Slough | 724–729 Dundee Road, SL1 4JU | 8.75 MW; high density up to 15 kW per rack, on review; LINX |
| Kao Data KLON-06 | Kao Data | Slough Trading Estate | 672 Galvin Road, SL1 4AN | 20 MW, Tier III equivalent |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix LD3 and LD9 | Equinix | Park Royal | Coronation Road, NW10 7PH; 2 Powergate Business Park, Volt Avenue, NW10 6PW | Interconnection; LD9 has 165,463 ft² of colocation space |
| Ark Union Park | Ark Data Centres | Hayes | Bulls Bridge Industrial Estate, UB3 4DG | 99 MW across four data centers |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Pulsant Croydon LN-1 | Pulsant | Croydon | Unit 1, 35 Imperial Way, CR0 4RR | Regional edge site; racks up to 30 kW |
| Kao Data Harlow campus | Kao Data | Harlow, Essex | London Road, CM17 9NA | KLON-03 with hybrid direct-to-chip cooling, racks up to 130 kW; NVIDIA DGX-Ready |
| Ark Longcross Park | Ark Data Centres | Chertsey, Surrey | KT16 0EE | 54 MW across two data centers; liquid and air cooling |
A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); “LINX” marks sites on LINX’s own network maps (October 2026). We also work with London-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.
Different workloads. The same need for power, interconnection and clear commercial terms.
London suits companies serving UK users from the UK, financial firms that need the trading ecosystem in Slough and the City, and networks that peer at LINX. Match your workload to the power, cooling and data rules you need, then compare the full cost.

UK hosting for customers and contracts that ask where their data lives.
Low latency to the City and the trading ecosystem in Slough, with the audit evidence regulators ask for.
Peering at LINX, where more than 780 networks connect to its main London platform.
Dense racks near London where usable kW, cooling and electricity terms are confirmed in writing.
UK production workloads with redundancy, remote hands and room to grow.
A UK recovery site, priced against Amsterdam, Dublin or Paris.
UK rules decide part of what you pay for, and what you can ask a provider to prove.
Personal data can move freely between the EU and the UK: the EU renewed the UK’s adequacy status in December 2025, until 27 December 2031. Transfers to certified US companies are covered by the UK–US data bridge, in force since October 2023.
The UK classed data centers as Critical National Infrastructure in September 2024. The sector gets a dedicated government team and priority access to the National Cyber Security Centre in an incident.
A new cyber law is in its final stage in Parliament. As proposed, it brings third-party data centers of 1 MW and up under Ofcom’s supervision, with incident reports within 24 hours. Check its status before you sign.
UK quotes are usually before VAT, and the standard rate is 20%. How VAT applies to a buyer outside the UK depends on the contract, so ask a tax adviser.
Sources: European Commission on UK adequacy; UK–US data bridge; data centers as critical national infrastructure; Cyber Security and Resilience Bill (at the Lords amendments stage on 24 November 2026); UK VAT rates. A summary, not legal or tax advice.
“Prices in London move month to month. Tell me what you’re deploying and where your users are, and I’ll come back with the sites that have room now and what they cost.”
Bob Spiegel, Founder, QuoteColo
